Clussais
Tiper
MLHCP

Clussais

France
Start of Operation
2017
Total Capacity
10
Megawatts
Installed Turbines
5
Vestas V100

Tiper

France
Start of Operation
2017
Total Capacity
6
Megawatts
Installed Turbines
3
Vestas V100

MLHCP

France
Start of Operation
2015
Total Capacity
21
Megawatts
Installed Turbines
7
Enercon E101
previous project
next project
  • Clussais
  • Tiper
  • MLHCP