Germany

The wind farm Creussen was developed by SOWITEC and begann operation in 2004. Creussen II is an extension to this project adding two Nordex N114 windturbines to the already existing three NEG Micon NM82 bringing the total capacity to 10.3 MW.

Start of Operation
2015
Total Capacity
4,8
Megawatts
Installed Turbines
2
Nordex N114

Creussen III

Germany
Start of Construction in 2026.

The wind farm Creußen was developed by SOWITEC and begann operation in 2004. Creußen II is an extension to this project adding two Nordex N114 wind turbines to the already existing three NEG Micon NM82 bringing the total capacity to 10.3 MW. Creußen III is a repowering project. Creußen I shall be replaced by 2x Vestas V172-7.2 MW at hub height 175 m.

Start of Operation
2027
Total Capacity
14.4
Megawatts
Installed Turbines
2
Vestas V172

Himmelberg

Germany
Start of Operation
1995
Total Capacity
1,8
Megawatts
Installed Turbines
3
NEG Micon NM 43

Wiesensteig

Germany
Start of Operation
1999
Total Capacity
4,5
Megawatts
Installed Turbines
6
NEG Micon NM 48

Ingstetten

Germany
Start of Operation
2000
Total Capacity
2,3
Megawatts
Installed Turbines
3
NEG Micon NM 48

Auingen

Germany
Start of Operation
2000
Total Capacity
1,5
Megawatts
Installed Turbines
2
NEG Micon NM 48

Böttingen

Germany
Start of Operation
2000
Total Capacity
2,3
Megawatts
Installed Turbines
3
NEG Micon NM 48

Simonswald

Germany
Start of Operation
2000
Total Capacity
3
Megawatts
Installed Turbines
3
NEG Micon NM 60

Frauenprießnitz I

Germany
Start of Operation
2001
Total Capacity
1,5
Megawatts
Installed Turbines
2
NEG Micon NM 48

Frauenprießnitz II

Germany
Start of Operation
2001
Total Capacity
1,7
Megawatts
Installed Turbines
2
Frisia F56

Dornhan

Germany
Start of Operation
2003
Total Capacity
1,5
Megawatts
Installed Turbines
1
NEG Micon NM 82

Waldmössingen

Germany
Start of Operation
2001
Total Capacity
3,6
Megawatts
Installed Turbines
4
NEG Micon NM 52

Kundert

Germany
Start of Operation
2012
Total Capacity
1,7
Megawatts
Installed Turbines
2
Enercon E53

Frauenprießnitz III

Germany
Start of Operation
2002
Total Capacity
5,4
Megawatts
Installed Turbines
6
NEG Micon NM 52

Minden

Germany
Start of Operation
2003
Total Capacity
3
Megawatts
Installed Turbines
3
NEG Micon NM 60

Meineweh I

Germany
Start of Operation
2004
Total Capacity
0,8
Megawatts
Installed Turbines
1
NEG Micon NM 48

Creussen I

Germany
Start of Operation
2004
Total Capacity
4,5
Megawatts
Installed Turbines
3
NEG Micon NM 82

Harrienstedt

Germany
Start of Operation
2004
Total Capacity
7,5
Megawatts
Installed Turbines
5
NEG Micon NM 82

Kehrberg

Germany
Start of Operation
2004
Total Capacity
6
Megawatts
Installed Turbines
4
NEG Micon NM 82

Meineweh II

Germany
Start of Operation
2004
Total Capacity
1,5
Megawatts
Installed Turbines
1
NEG Micon NM 72

Löhne I

Germany
Start of Operation
2005
Total Capacity
1,5
Megawatts
Installed Turbines
1
NEG Micon NM 82

Löhne II

Germany
Start of Operation
2006
Total Capacity
1,5
Megawatts
Installed Turbines
1
Vestas V82

Hesselbach

Germany
Start of Operation
2005
Total Capacity
1,5
Megawatts
Installed Turbines
1
NEG Micon NM 82

Oberngrub

Germany
Start of Operation
2005
Total Capacity
7,5
Megawatts
Installed Turbines
5
NEG Micon NM 82

Meineweh III

Germany
Start of Operation
2005
Total Capacity
7,5
Megawatts
Installed Turbines
5
NEG Micon NM 72

Barendorf

Germany
Start of Operation
2005
Total Capacity
6,0
Megawatts
Installed Turbines
4
NEG Micon NM 82

Rüddingshausen

Germany
Start of Operation
2006
Total Capacity
3,4
Megawatts
Installed Turbines
4
Gamesa G58

Meineweh IV

Germany
Start of Operation
2008
Total Capacity
4
Megawatts
Installed Turbines
2
Vestas V90

Meineweh V

Germany
Start of Operation
2008
Total Capacity
0,8
Megawatts
Installed Turbines
1
Enercon E53

Eppenrod

Germany
Start of Operation
2001
Total Capacity
2,7
Megawatts
Installed Turbines
3
NEG Micon NM 52

Düsedau

Germany
Start of Operation
2002
Total Capacity
7,5
Megawatts
Installed Turbines
5
NEG Micon NM 72

Edersleben

Germany
Start of Operation
2001
Total Capacity
12
Megawatts
Installed Turbines
12
NEG Micon NM 60

Hohfleck

Germany
Start of Construction in 2023.

Die fünf Windenergieanlagen des Typen Vestas V150-4.2 MW, mit einer Nabenhöhe von 123 m und einer Gesamthöhe von 200 m werden im Waldgebiet zwischen Sonnenbühl-Undingen und Engstingen errichtet. Mit überdurchschnittlicher Windgeschwindigkeit, großen Abständen zu den umliegenden Gemeinden und minimalen Auswirkungen auf Natur und Umwelt ist der Standort ausgezeichnet für die Nutzung der Windenergie geeignet. Der Windpark wird genügend Strom produzieren, um über 13.500 Haushalte zu versorgen. Das sind mehr als in den umliegenden Gemeinden Sonnenbühl, Engstingen und Lichtenstein zusammen.

Weitere Informationen zur Realisierung des Windparks:

Februar 2023: Windpark Hohfleck geht in die heiße Phase. Beginn der Rodung

 

 

Start of Operation
11/2025 - 01/2026
Total Capacity
21
Megawatts
Installed Turbines
5
Vestas V150-4.2 MW
previous project
next project
  • Creussen II
  • Creussen III
  • Himmelberg
  • Wiesensteig
  • Ingstetten
  • Auingen
  • Böttingen
  • Simonswald
  • Frauenprießnitz I
  • Frauenprießnitz II
  • Dornhan
  • Waldmössingen
  • Kundert
  • Frauenprießnitz III
  • Minden
  • Meineweh I
  • Creussen I
  • Harrienstedt
  • Kehrberg
  • Meineweh II
  • Löhne I
  • Löhne II
  • Hesselbach
  • Oberngrub
  • Meineweh III
  • Barendorf
  • Rüddingshausen
  • Meineweh IV
  • Meineweh V
  • Eppenrod
  • Düsedau
  • Edersleben
  • Hohfleck