Creussen II
GermanyThe wind farm Creussen was developed by SOWITEC and begann operation in 2004. Creussen II is an extension to this project adding two Nordex N114 windturbines to the already existing three NEG Micon NM82 bringing the total capacity to 10.3 MW.
Creussen III
GermanyThe wind farm Creußen was developed by SOWITEC and begann operation in 2004. Creußen II is an extension to this project adding two Nordex N114 wind turbines to the already existing three NEG Micon NM82 bringing the total capacity to 10.3 MW. Creußen III is a repowering project. Creußen I shall be replaced by 2x Vestas V172-7.2 MW at hub height 175 m.
Himmelberg
GermanyWiesensteig
GermanyIngstetten
GermanyAuingen
GermanyBöttingen
GermanySimonswald
GermanyFrauenprießnitz I
GermanyFrauenprießnitz II
GermanyDornhan
GermanyWaldmössingen
GermanyKundert
GermanyFrauenprießnitz III
GermanyMinden
GermanyMeineweh I
GermanyCreussen I
GermanyHarrienstedt
GermanyKehrberg
GermanyMeineweh II
GermanyLöhne I
GermanyLöhne II
GermanyHesselbach
GermanyOberngrub
GermanyMeineweh III
GermanyBarendorf
GermanyRüddingshausen
GermanyMeineweh IV
GermanyMeineweh V
GermanyEppenrod
GermanyDüsedau
GermanyEdersleben
GermanyHohfleck
GermanyDie fünf Windenergieanlagen des Typen Vestas V150-4.2 MW, mit einer Nabenhöhe von 123 m und einer Gesamthöhe von 200 m werden im Waldgebiet zwischen Sonnenbühl-Undingen und Engstingen errichtet. Mit überdurchschnittlicher Windgeschwindigkeit, großen Abständen zu den umliegenden Gemeinden und minimalen Auswirkungen auf Natur und Umwelt ist der Standort ausgezeichnet für die Nutzung der Windenergie geeignet. Der Windpark wird genügend Strom produzieren, um über 13.500 Haushalte zu versorgen. Das sind mehr als in den umliegenden Gemeinden Sonnenbühl, Engstingen und Lichtenstein zusammen.
Weitere Informationen zur Realisierung des Windparks:
Februar 2023: Windpark Hohfleck geht in die heiße Phase. Beginn der Rodung